Everlert, Inc. (OTC: EVLI), Highlights Technical Report of Bolivian Copper-Gold Project With Updated Independent Technical Review
Third-Party Geological Review of Expanded Historical Technical Data Supports Continued Advancement Planning for the Company’s Flagship Bolivian Mining Asset Platform
SOUTHLAKE, Texas, May 27, 2026 (GLOBE NEWSWIRE) — Everlert, Inc. (OTC: EVLI) (“Everlert” or the “Company”), operating under the recently adopted legal name American Gold & Copper Inc., provided an update regarding ongoing technical evaluation of its Bolivian copper-gold project platform, including receipt and review of a May 25, 2026 technical assessment communication from independent geological consultants Capps Geoscience, LLC.
According to Capps Geoscience, the firm reviewed the project’s historical NI 43-101 technical report together with 63 additional historical drill holes and expanded geoscience work not fully incorporated into the earlier project framework. A copy of the historical technical report reviewed by Capps Geoscience is available here: SAC Report & Addendum. Based on that review, Capps indicated that the expanded technical dataset materially impacts project assessment criteria and supports continued advancement of the project through further technical evaluation, drilling, assay validation, and operational planning.
Capps further noted that, notwithstanding the elapsed period since preparation of the 2021 historical technical report, the underlying project framework remains suitable for continued technical advancement, citing the continued availability in Bolivia of assay laboratories, mining personnel, drilling capability, and heavy equipment necessary to support future technical work and project progression.
The underlying asset package consists of four contiguous mining concessions in eastern Bolivia covering approximately 42,175 hectares in the Guarayos Province, representing a significant land position within a historically underexplored Proterozoic greenstone belt prospective for copper, gold, and silver mineralization.
Historical technical materials reviewed by the Company indicate:
- More than $27 million in historical exploration and infrastructure investment
- More than 90 geological reports generated over the project’s operating history
- 63 additional historical drill holes reviewed by independent technical consultants
- More than 21,000 historical samples and assays
- Extensive auger, reverse circulation, and diamond drilling programs
- Existing camp and operational infrastructure for phased development planning
“What stood out in this review was not just the historical technical foundation, but the additional drilling and geological work that had never been fully incorporated into the earlier framework,” said Brent Nelson, President of South American Copper Ltd. “Capps’ review reinforces our view that this project warrants continued advancement through disciplined technical work, validation, and development planning. We have invested years building this asset platform, and this updated independent review represents an important technical checkpoint as we move forward.”
The Company is evaluating next-stage technical initiatives, which may include additional geological review, historical data validation, updated technical reporting analysis, drilling program design, and broader project development planning intended to support long-term operational and capital markets objectives.
The technical materials referenced in this release include a historical NI 43-101 technical report, together with supplemental independent review materials relating to the Company’s Bolivian mining assets. This information is being presented in the context of the Company’s ongoing technical evaluation and development planning and should not be construed as a newly commissioned current technical report, updated mineral resource estimate, or reserve determination.